Reserve not met No Image Lot 1 28" x 120" HAAS VF10/40 CNC VERTICAL MACHINING CENTER, NEW 2013 128" x 120" HAAS VF10/40 CNC VERTICAL MACHINING CENTER, NEW 2013 Premier Asset Recovery Group 28" x 120" HAAS VF10/40 CNC VERTICAL MACHINING CENTER, NEW 2013, 8100 RPM, 4TH AXIS READY,COOLANT THRU SPINDLE, EARLY POWER FAILURE DETECTION,... Add to watchlist Timed
Reserve not met No Image Lot 2 HAAS VF-7/40 CNC 4-AXIS CNC VERTICAL MACHINING CENTER, NEW 2012 2HAAS VF-7/40 CNC 4-AXIS CNC VERTICAL MACHINING CENTER, NEW 2012 Premier Asset Recovery Group HAAS VF-7/40 CNC 4-AXIS CNC VERTICAL MACHINING CENTER, NEW 2012, 4TH AXIS ROTARY TABLE,10,000 RPM SPINDLE, REMOTE JOG HANDLE, PCOOL STRICT RE... Add to watchlist Timed
Reserve not met No Image Lot 2.1 HAAS VF-7/40 CNC 4-AXIS CNC VERTICAL MACHINING CENTER, NEW 2011 2.1HAAS VF-7/40 CNC 4-AXIS CNC VERTICAL MACHINING CENTER, NEW 2011 Premier Asset Recovery Group HAAS VF-7/40 CNC 4-AXIS CNC VERTICAL MACHINING CENTER, NEW 2011, 4TH AXIS ROTARY TABLE,10,000 RPM SPINDLE, REMOTE JOG HANDLE, PCOOL STRICT REMOV... Add to watchlist Timed
Reserve not met No Image Lot 2.5 HAAS VF-7/40 CNC 3-AXIS CNC VERTICAL MACHINING CENTER, NEW 2008 2.5HAAS VF-7/40 CNC 3-AXIS CNC VERTICAL MACHINING CENTER, NEW 2008 Premier Asset Recovery Group HAAS VF-7/40 CNC 3-AXIS CNC VERTICAL MACHINING CENTER, NEW 2008,10,000 RPM SPINDLE, REMOTE JOG HANDLE, PCOOL STRICT REMOVAL SCHEDULE. SEE RIGG... Add to watchlist Timed
Reserve not met No Image Lot 3 HAAS VF3- CNC PRECISION VERTICAL MACHINING CENTER, NEW 2013 3HAAS VF3- CNC PRECISION VERTICAL MACHINING CENTER, NEW 2013 Premier Asset Recovery Group HAAS VF3- CNC PRECISION VERTICAL MACHINING CENTER, NEW 2013COOLANT THRU, PROGRAMABLE COOLANT NOZZLE, RIGID TAP, STRICT REMOVAL SCHEDULE. SEE RIG... Add to watchlist Timed
Reserve not met No Image Lot 4 HAAS MODEL VF-3 CNC VERTICAL MACHINING CENTER, NEW 2005 4HAAS MODEL VF-3 CNC VERTICAL MACHINING CENTER, NEW 2005 Premier Asset Recovery Group HAAS MODEL VF-3 CNC VERTICAL MACHINING CENTER, NEW 2005, 10,000 RPM, 4TH AXIS READY,COOOLANT THRU SPINDLE STRICT REMOVAL SCHEDULE. SEE RIGGING/R... Add to watchlist Timed